Desk frame with height adjustment RXD2, two motors, white
- Delivery times see below: In Stock
- Brand: BIM (PL)
- Reward Points: 26
- Model: 8267
- Size: →170.00cm x ↗68.00cm x ↑72.00cm
- SKU: PODNOSNIK_DO_BIURKA_RXD2-1-2SN_B
The final delivery price is set by the manager once your order is received and confirmed.
Specifications
| Dimensions | |
| Length (cm) | 170 |
| Height (cm) | 72 |
| General characteristics | |
| Body color | white |
| Facade color | white |
| Body material | Laminated chipboard |
| Facade material | Laminated chipboard |
| Coating Furniture | Laminate |
| Warranty & Delivery, Country of origin | |
| Supplier Warranty | 12 months |
Delivery: 60-90 business days
Specifications and Product Overview
RXD2: two motors and a reach of 170 cm
The senior frame of the line: two motors instead of one and a reach of 170 cm, for a long top worked at by two people or carrying two monitors. No top is supplied; you bring your own. Colour white.
Who it suits
For a study where the desk is long and heavy: two motors raise such a surface level, with no tilt to one end. It also serves a shared table in a meeting room.
What you will like
- two motors, so a long top rises without tilting
- width from 105 to 170 cm
- height from 72 to 120 cm
- position memory and a controller wherever you put it
- supports 68 cm deep, steadier than a single-motor frame
Width from 105 to 170 cm and height from 72 to 120, on supports 68 cm deep. That is 8 cm more than RXD1 gives: a long top needs a wider base.
Why does a lifting desk need two motors? Each motor drives its own support. At widths up to 170 cm a single motor would pull the surface through a crossbar and one end would lag. Two motors run in step.
What length of top will suit? From 105 to 170 cm across the width range. Depth is free, but a large forward overhang starts the desk rocking.
Materials and finish
Powder-coated metal. Colour white. Warranty 12 months. BIM Furniture, Poland.
Frequently asked questions
Are two motors louder than one?
Each works at half effort, so the total sound is about the same. You hear an even hum for a few seconds while the desk travels.
Will the frame take a stone top?
The factory allows any top but quotes no maximum weight in the price list. Stone is several times heavier than board, so that case is worth checking with the supplier.
Polish furniture in an Israeli study: RXD2 travels to Tel Aviv, Petah Tikva and Kfar Saba.
Delivery and Assembly
Delivery Time and Shipping Cost:
Delivery and Assembly:
Attention! The cost of delivery and assembly depends on the type of furniture, delivery address, floor, elevator. Therefore the cost of delivery and assembly is set with the store representative at the time of order confirmation. Payment for supplies and the assembly is paid directly to the carrier on the day of receipt of the goods. Delivery to localities that are far from the center of the country, such as: everything further from Karmiel in the north, everything further from Beersheba in the south and Jerusalem, will charge an additional fee of 150 NIS. Delivery to Eilat will be negotiated individually, having previously checked with a customer service representative. If a crane (manof) is required to transport the goods, the client is obliged to find, order and pay for the crane services himself.
Delivery times for each product are specified separately. When calculating delivery times, only working days (from Sunday to Thursday of the week, excluding weekends, bank holidays and public holidays) from the date of receipt of payment from the customer's credit company are taken into account.
There may be delays due to sea delivery when ordering furniture from abroad, which cannot be influenced by the Supplier, in these cases the delivery time will be extended by another 30 working days and will not be considered a delay. However, suppliers make every effort to expedite delivery as much as possible, but, being unable to guarantee this, therefore, the online store is not responsible for any delays.
Furniture from the "Modular Furniture" category is modular, which reserves the right for the Supplier to make delivery as the modules arrive from the factory, within an additional 60 working days after the first delivery of the goods to the customer's home.


Delivery: 60-90 business days









